Installation
How long does it take to install solar?
20 May 2026 · 4 min read
The install itself is quick, it’s the planning around it that takes the most time. Here’s the typical journey.
Design and approvals
After your free assessment we finalise the design and handle the paperwork, grid connection application and any approvals. This is usually the longest part.
Installation day
Most residential systems are installed in a single day by our CEC-accredited team, panels, inverter, cabling and monitoring, all tidied up before we leave.
Switch-on
Once your meter is reconfigured by your network, we commission the system, set up monitoring and show you how it all works.
Ready to slash your power bills?
Get a free solar assessment and a fixed-price quote, with a clear estimate of exactly what you’ll save.