How long does it take to install solar?

The install itself is quick — it’s the planning around it that takes the most time. Here’s the typical journey.

Design and approvals

After your free assessment we finalise the design and handle the paperwork — grid connection application and any approvals. This is usually the longest part.

Installation day

Most residential systems are installed in a single day by our CEC-accredited team — panels, inverter, cabling and monitoring, all tidied up before we leave.

Switch-on

Once your meter is reconfigured by your network, we commission the system, set up monitoring and show you how it all works.

Back to blog

Get expert solar advice

Tell us about the job and we’ll come back with a fixed, no-obligation price. Servicing Maroochydore, Buderim, Caloundra and surrounds.

Call 07 5400 1234

No spam, ever. We only use your details to quote your job.

Ready to slash your power bills?

Get a free solar assessment and a fixed-price quote — with a clear estimate of exactly what you’ll save.

Call now Get a free quote